ADU Specials in Hemet, CA
We’re running a handful of standing offers for Hemet homeowners because an ADU is already a big enough decision without wondering if you left something on the table. Call (951) 430-0167 and mention which offer you’re interested in when you speak with our live person. Every special below stacks with our written-price guarantee under Haven Standard Clause 1, so the number you see before work starts is the number you pay.
Current Offers
Free Second Opinion on Any Written ADU Estimate
Already have a proposal from another design-build firm, prefab coordinator, or architect in Hemet? We’ll review every line item against current Riverside County permit fees, Hemet-specific setback requirements, and the actual scope you’re getting. Nadia Ellery or a senior estimator will walk through the estimate with you and flag anything that looks padded, omitted, or out of step with what we’ve seen on 900+ ADU projects since 2015.
This applies to garage conversion ADUs, detached new-build ADUs, Junior ADUs, and interior conversion projects anywhere in the Hemet Valley. Bring the competing written estimate to your appointment.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
365-Day Done Right Promise, Documented in Writing Before Break Ground
Most warranties in this trade are verbal assurances that evaporate when the crew moves to the next job. Under Haven Standard Clause 7, we put our Done Right Promise in your project file before excavation starts: if the finished ADU in Hemet doesn’t match the permitted drawings, we make it right. That includes slab elevation, window placement, utility tie-ins, and finish materials.
The documentation package you’ll receive includes the written promise, the photo record of every visit, and the final punch list with sign-off. No homeowner in Hemet should finish an ADU with a handshake and a hope.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
Documented Photo Record Included on Every Visit at No Extra Charge
Some Hemet ADU builders summarize progress in a text message. We deliver timestamped, geotagged photos of what we found and what we did: existing slab condition before garage conversion, trench depth for sewer lateral, rebar placement before the pour, rough electrical before insulation. You get the evidence, not a narrative about how it felt.
This is standard on every Ellery ADU Studio Hemet project, but we’re highlighting it here because homeowners often tell us they didn’t realize other firms charge extra for documentation, or skip it entirely. On a 400-square-foot detached ADU in the Hemet Hills, that photo record has saved more than one client from a dispute over whether the original grade was properly compacted.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
Written Price Before Any Work Starts - Haven Standard Clause 1
This isn’t a discount in the traditional sense. It’s a structural guarantee that protects Hemet homeowners from the change-order spiral that wrecks ADU budgets across Riverside County. We deliver a line-item written quote covering design, permitting, site prep, construction, and utility tie-ins before you sign. The words “call for a quote” do not appear anywhere in our process.
If you’re comparing Ellery ADU Studio Hemet to a firm that won’t commit to a number until demo day, this offer is the difference between a project you can finance and a project that bleeds cash. We’ve held to this since 2015 across garage conversions in the Ramona Bowl area, detached ADUs near Diamond Valley Lake, and Junior ADUs in the historic downtown core.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
Prefab & Modular Coordination - Single Contract for Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie Systems
Hemet homeowners exploring factory-built ADU options often get caught between the prefab sales team and a local contractor who won’t touch the install. We specify and coordinate all eight brands under the same one-contract design-build model that covers our stick-built work. That means one written price, one permit set, one point of contact when the module arrives and the crane operator is waiting.
We’ve coordinated Mighty Buildings deliveries to tight Hemet lots where the truck access required a temporary curb cut, and we’ve managed James Hardie siding integration on Boxabl units where the factory finish didn’t quite match the existing residence. One contract means neither the designer nor the builder can point at the other.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
Live Person Answers Your Call 24/7 - No Voicemail Queue, No Callback That Doesn’t Materialize
This matters more during ADU construction than homeowners expect. Permit questions come up at odd hours. A Riverside County inspector’s feedback on your garage conversion foundation plan might need a same-day answer to avoid a week-long delay. When you call (951) 430-0167, a live person picks up, every time, including weekends.
We’ve answered at 10 PM from a Hemet homeowner whose neighbor’s tree crew severed the temporary power drop to their detached ADU site. The call didn’t solve the problem instantly, but it started the solution immediately instead of adding a 48-hour voicemail limbo to an already bad situation.
Valid through December 31, 2026. Mention this offer when you call (951) 430-0167.
How to Redeem

Step 1: Call and mention the offer. Dial (951) 430-0167 and tell the live person which special you’re calling about. They’ll note it in your file before the conversation starts.
Step 2: Book your site visit or estimate review. For the Free Second Opinion, bring your written estimate. For new projects, we’ll schedule a walkthrough of your Hemet property to assess access, utilities, and any site-specific constraints like the decomposed granite soils common east of State Street.
Step 3: Receive your written quote with the offer applied. Every proposal includes the Haven Standard documentation: line-item pricing, permit timeline, photo record protocol, and the 365-Day Done Right Promise. Review, sign when you’re ready, and we move to permit submission.
What These Offers Don’t Cover
We don’t do urgency theater. There are no “only 3 slots left” countdowns because Hemet’s ADU demand doesn’t work that way, and pretending otherwise insults your intelligence. These aren’t introductory teaser rates that expire in 48 hours. They’re standing commitments from an independently owned and operated studio that’s been pricing ADUs honestly since 2015.
We also don’t stack discounts against each other in ways that would compromise the scope. The Free Second Opinion and the Written Price Guarantee are always available. The Prefab Coordination and Photo Record are built into every project. What we’re offering here is transparency about what you already get, so you don’t have to negotiate for it.
Why Hemet Homeowners Choose Ellery ADU Studio

Hemet’s ADU market has specific friction points that generic Inland Empire builders miss. The city sits in a basin where summer temperatures hit 110 degrees, so our cooling load calculations for detached ADUs run higher than coastal California standards. Many lots in the older neighborhoods have unpermitted additions from the 1970s that complicate setback measurements. The water table varies dramatically between the valley floor and the hills south of Domenigoni Parkway, affecting septic feasibility for rural-adjacent properties.
We’ve navigated these issues on projects in the Mayberry area, near Simpson Park, and along the Florida Avenue corridor. Our 900+ project history includes enough Hemet-specific experience that we can tell you, in the first site visit, whether your garage conversion will trigger a fire separation requirement or whether your detached ADU lot coverage puts you into a discretionary review.
Every crew that works on your property is background-checked and uniformed, and our license number appears on every page of this site. Nadia Ellery reviews the permit set personally before submission to Riverside County, because the county’s plan check backlog is real, and a rejected set costs you two to four weeks.
Ready to see what your ADU project actually costs? Call (951) 430-0167 for your free estimate with a written price before any work starts.
Written by Nadia Ellery, Owner at Ellery ADU Studio Hemet, serving Hemet and the San Jacinto Valley since 2015.